Bruce Highway – Deception Bay Road Interchange Stage 1 (Package 3)

Building Queensland led the development of the Bruce Highway Deception Bay Road Interchange Detailed Business Case in partnership with the Department of Transport and Main Roads. The business case investigated the following enhancements to reduce congestion and improve safety:

  • replacement of the existing two-lane Deception Bay Road bridge over the Bruce Highway with two 4 lane bridges
  • replacement of the signalised northbound and southbound Bruce Highway on ramps with free flow ramps
  • upgrades to the intersections east and west of the interchange to accommodate future traffic growth.

The detailed business case was endorsed by the Building Queensland Board in Q3 2018.

All Completed Business Cases

Gold Coast Light Rail Stage 3A – Broadbeach to Burleigh Heads

The Gold Coast is Australia’s largest non-capital city and the second largest city in Queensland, with its population forecast to increase by 61 per cent to 928,000 in 2041. The provision of high-capacity public transport will allow the Gold Coast to accommodate forecast growth while preserving the attractiveness and liveability of the southern Gold Coast.

More

Lower Fitzroy River Infrastructure Project

Building Queensland completed the detailed business case for the Lower Fitzroy River Infrastructure Project in partnership with the joint proponents, SunWater and the Gladstone Area Water Board, in late 2017.

More

Caboolture Hospital Expansion Stage 1

The infrastructure at Caboolture Hospital is operating at capacity in a number of areas, and the hospital currently faces long emergency department waiting times and overcrowding.

More